Franklin

Business Segment:
Hydroelectric

Location:
On the Winnipesaukee River in the Town of Franklin, New Hampshire

Installed Capacity:
1,800 kilowatts

The Franklin Facility consists of two independent powerhouses located on the Winnipesaukee River in the Town of Franklin, New Hampshire, and located several kilometers downstream from the Clement Dam Facility. The River Bend Turbine-Generator is rated at 1,600 kilowatts and is located in a powerhouse which was constructed in 1985. The facility is constructed at the location of an existing 70 foot wide dam and includes a 1,000 foot long concrete penstock which is 8 feet in diameter. The Steven’s Mill Turbine-Generator, rated at 220 kilowatts, is housed in a powerhouse located immediately adjacent to the dam.

An interconnection agreement was executed on December 12, 1984 with PSNH which provides together with a long term rate filing issued by the Public Utilities Commission of New Hampshire on December 20, 1984, that all electrical energy produced by each of the Steven’s Mill Turbine-Generator and the River Bend Turbine-Generator will be sold to PSNH. The term of the rate order is for 20 years, commencing January 1986, which was the commissioning date of the facility. The rate order expires in 2006. The amount payable under the agreement is based on a time differentiated energy payment plus a capacity payment.

Back to Hydroelectric Facilities List

Previous Facility Sorted by Business Segment | Next Facility Sorted by Business Segment


© Copyright Algonquin Power & Utilities Corp. 2003-2009