| Home | Sitemap | Contact | News Alerts | français |

       
 

Hadley Falls

Business Segment:
Hydroelectric

Location:
On the Piscataquog River near the Town of Gofftown, New Hampshire

Installed Capacity:
250 kilowatts

The Hadley Falls Facility is a 250 kilowatt hydroelectric generating facility located on the Piscataquog River near the Town of Gofftown, New Hampshire. The facility consists of a dam, intake canal, powerhouse and tailrace structures and is designed and operated as a run-of-the-river facility. The facility was constructed in 1986 at the site of an existing concrete dam which was rebuilt to facilitate thr facility.

In 1986, the NHPUC approved a rate order which requires PSNH to purchase the entire electrical output from the Hadley Falls Facility at specified rates. The amount payable is based on an energy payment plus a capacity payment. The term of the rate order is for a period of 20 years commencing September 1, 1986 and expires in September 2006.

Back to Hydroelectric Facilities List

Previous Facility Sorted Region | Next Facility Sorted Region


© Copyright Algonquin Power & Utilities Corp. 2003-2009
Algonquin Power & Utilities Corp., 2845 Bristol Circle, Oakville, ON Canada, L6H 7H7
Tel: 905.465.4500 Fax: 905. 465.4514